Infinity Concept Engineering

TELUK INTAN HOSPITAL – NEO-NATAL ICU (NICU)

Client Challenges

RH has failed

Mold issue is extensive

Condensation is everywhere

Water pooling in various areas

Nurse have to put pails to catch condensation water.

Solution Provided

Install our ICON unit as DOAS to reduce the humidity of the room and to create a positive pressure in the department.

Results & Achievement

Room Temperature and RH Achieved

Mold eliminated

Water pooling disappeared

Condensation is stopped RH is within specifications.

References

We Are Expert in Cleanroom Solution!

Download our brochure to learn more about cleanroom technology, or contact us for more information about our services.